Recent Projects
 

Best Storage - Dripping Springs Completed 10/06/03

It consists of conventional stucco 3/4" thick
First the metal lath installed with paper & Control Joints
2nd Scratch Coat applied
3rd Brown Coat applies
4th Finish coat with color texture applied.
 

 

Leo Buckley Stadium Project Completed 8/16/03

EIFS (Exterior Insulation Finish System) The name of this System is called the Out-sulation MD - which includes:

  1.  weather barrier (blue color that you see on the photo.

  2.  A 2" white foam is installed on top of exterior sheetrock. 

  3. A fabric mesh with primus (cement) applied to foam. 

  4.  Final step is texture application with color.

 

 

Copyright 2003 Costilla Construction Management. All rights reserved.